EVERY STATION.
EVERY DROP. EVERY BIN.
Water utilities and public works departments run thousands of unattended assets — pump stations, treatment plants, distribution nodes, waste-collection routes. The platform unifies water, wastewater, and solid-waste operations onto one operating layer: autonomous edge control at the station, live dashboards for the operations center, and consent-decree-defensible logging for the regulator.

AGING INFRASTRUCTURE. THOUSANDS OF STATIONS. MANUAL DATA.
Utilities are managing 30-year-old assets with 5-year-old SCADA and clipboards. Consent decrees demand defensible data. Boards demand energy KPIs. Citizens demand transparency. And the workforce keeps retiring. The platform brings every station, every plant, and every route into one operating layer — with role-based dashboards for ops, maintenance, and the executive.
AUTONOMOUS AT THE EDGE. UNIFIED IN THE CENTER.
Instrument the station
Wet-well level, 3-phase pump energy, vibration on every motor and bearing, PLC handshake over Modbus RTU or OPC-UA. Bench-configured, same-day install.
Autonomous edge control
Peer-to-peer level-to-relay control keeps the wet well safe even if the uplink fails. The dashboard sends override commands when the operations center chooses to.
Unified dashboards
Every station on the same dashboard. Role-based views for water ops, wastewater ops, sanitation, maintenance, and the executive. Alarms routed by role automatically.
Report & scale
Monthly utility KPI report. Quarterly board package. Annual consent-decree audit export. Roll out at 10–40 stations per quarter on the utility's cadence.
PROVEN AT UTILITY SCALE.

UTILITY-GRADE FROM DAY ONE.
Wet-Well Level & Volume
Ultrasonic level sensing at every wet well. Automatic volume calculation from tank geometry. Overflow-risk alarms configurable per station. Consent-decree logging.
3-Phase Pump Energy
kW, kWh, voltage, current, power factor per pump. Energy anomalies auto-flagged. Monthly energy KPI report per station and rolled up to the utility total.
Predictive Motor Maintenance
Vibration RMS and FFT on drive-end and non-drive-end bearings. Edge AI catches anomalies before failure. Motor life extended by weeks or months.
PLC / SCADA Handshake
Modbus RTU / OPC-UA / DNP3 handshake with existing PLCs. The IoT layer never fights the PLC — it augments it and reports the PLC's own state up to the dashboard.
Dashboard-Commanded Control
Operations-center override of any pump from anywhere. Full audit trail. Role-based permissions. Two-factor confirmation on manual overrides in critical stations.
Waste-Collection Intelligence
Bin fill levels, route optimization, tampering and fire alerts, contamination flags. Citizen-facing dashboard option for public transparency.
Water-Quality Monitoring
pH, turbidity, ORP, and free-chlorine at critical sample points. Continuous logging replaces intermittent grab samples. Regulator-defensible.
Alarm Routing by Role
Overflow risk → ops center. Predictive maintenance → maintenance manager. Energy anomaly → CFO monthly. Water quality → compliance officer. All configurable.
IN PRODUCTION
Standardizing all 20 pump stations on one architecture: wet-well level, 3-phase pump energy, motor vibration, PLC handshake. Edge-autonomous safety with dashboard override.
Miami-Dade / Broward / Palm Beach engagement — 1,000+ pump stations, 900+ lift stations across the region. Pilot-to-standardize model with role-based dashboards.
COMMON QUESTIONS
WILL THIS FIGHT OUR EXISTING SCADA?+
No. The IoT layer sits above the PLC — it never writes to the PLC without the PLC being in a mode that permits it. Modbus / OPC-UA / DNP3 handshake keeps the PLC in authority. Operators see PLC state, mode, and faults on the same dashboard as the IoT telemetry.
WHAT IF THE 4G/LTE UPLINK FAILS?+
The station keeps running safely. Peer-to-peer level-to-relay control at the edge means the wet well won't overflow or run dry even during multi-hour uplink outages. Data buffers locally and syncs when the link returns.
CAN THIS SUPPORT A CONSENT DECREE?+
Yes. Every telemetry point, alarm, and manual override is logged with time, actor, and reason. Export-ready reports for EPA/state audits. Long-term retention configurable to meet the specific decree.
HOW LONG IS A TYPICAL ROLLOUT?+
A 2–5 station pilot deploys in 8–12 weeks. From there we ramp at 10–40 stations per quarter depending on utility crew availability and site permitting. A 20-station utility completes in one to three quarters.
CAN WE ADD WASTE COLLECTION LATER?+
Yes. WasteIQ activates on the same platform. Same dashboards, same alarm-routing engine, same login. Add bin sensors and route-optimization modules on the utility's schedule.
PILOT IN 30 DAYS.
One area. One owner. One problem. Live data on the call, not slides.
